THE DUCT TAPE HOUSE
The scope of work for the first and second bedrooms (both located on the front of the house) was basically identical.
We replaced the entry doors, closet doors, and jack n jill bath doors, the windows, touched-up the drywall, installed a ceiling fans, refinished the hardwood floors, and painted the ceilings walls and trim. Done.